ACCIONA is able to design, build and expand transmission and substation lines through which it can connect the energy of the future. It does this through engineering operations, the supply of equipment for lines and substations, civil engineering works, electromechanical assembly and start-up tests.
The company has accumulated more than 70 projects in the last 12 years, ranging from the construction of low-voltage facilities to 400 kV substations and lines in various countries, contributing to the transition to a low-emission future.