14,000

Population equivalent

Design, construction and commissioning

The contract includes the design, construction and commissioning of the Vila Do Bispo Waste Water Treatment Plant, in the Algarve.

ACCIONA will assumed the entire civil engineering, equipment, electricity and automation of the plant. 

The water flow expected for the plant is 3,551 cubic meters per day, to supply 14.000 inhabitants.

General Information

  • Project: Vila Do Bispo WWTP
  • Company: ACCIONA
  • Location: Vila Do Bispo, Portugal
  • Capacity: 3.551 m3/day
  • Population equivalent: 14.000 people