Our foundation: acciona.org Initiatives we support Our strategy Sustainable Development Goals Climate emergency Social development Sustainability indices Sustainable Development Alliances Technology and innovation centres Open and collaborative innovation Digital hub Innovation projects Job offers Graduates and internships Diversity, equity and inclusion Safety, health and well-being Training Selection process Energy Transport Water Social Cities Real Estate Financial Integrated annual reports Annual accounts Results, reports & presentations Average period of payment to suppliers Ratings Share price Dividends Analyst opinions Investor calendar General Shareholders' Meeting Board of Directors and Committees Management team Share capital Annual Corporate Governance Report Director remuneration Governance rules and compliance Framework Agreement CNMV Communications Sustainable finance
Two wind farms of 252 MW in total Nuevo León, Mexico See on Google Maps
Largest contract for a turnkey project carried out by ACCIONA worldwide. The project, which was completed at the end of 2015 and went into full commercial operation in April 2016, has a total capacity of 252 MW.

The wind complex made up by Ventika and Ventika II wind farms represents the biggest turn-key contract (EPC) carried out by ACCIONA globally. This milestone in the company's track-record reaches 252 MW capacity thanks to eighty-four AW116/3000 wind turbines with Nordex/ACCIONA Windpower's technology. Each turbine, with 3 MW rated capacity, features a 116m-long rotor diameter on a 120m-high concrete tower. The project, which was installed by late 2015 and entered full commercial operation in April 2016, was built for a consortium formed by Fisterra Energy, CEMEX and some private inverstors. It is currently owned by IEnova (Sempra Energy). It was inaugurated by Mexican president Enrique Peña Nieto on September 12, 2016.

GENERAL INFORMATION

  • Location: General Bravo, Nuevo Leon. Mexico.
  • Capacity: 252 MW.
  • Wind turbine generator: ACCIONA Windpower AW116/3000.
  • Tower: Concrete, hub height 120m
  • Start-up: 2016.
  • Owners: EPC project for Cemex, Fisterra Energy and others.

KEY FIGURES

  • Largest EPC project carried out by ACCIONA Energy worldwide.
  • First wind farm featuring concrete towers in Mexico, manufactured close to the site which means relevant cost-savings.
  • Deep positive impact in the social and economic activity in the region.
  • Built in 18 months, before initially planned.
  • Covering an area of around seven thousand square meters, equivalent to near ten thousand football pitches.
  • Two CEMEX Prizes awarded for the constructive quality of the project and its innovative aspects.