The drafting of the project, construction and subsequent operation was carried out in a joint venture between Acciona and Abengoa, each holding a 50% stake. In 2020, the City Council decided to expand the plant in order to maximise its production.
The desalination plant covers most of the districts of the municipality. All of the water produced is intended for human consumption.
General Information
- Location: Almeria, Andalucía, Spain
- Capacity: 50,000 m3/d
- Water end-use: Human consumption