The project involved the twinning of the subsection of the Bahia Sur track, which is 9.3 km long and runs between the municipalities of San Fernando and Cádiz.
The new line has two general tracks with a distance between axes of 4.3 m and a platform width of 13.3 m. The project was completed in December 2008.
GENERAL INFORMATION
- Location: Seville - Cádiz, Spain.
- Contract type: Construction.
- Infrastructure: Two tracks with a distance between axes of 4.3 metres and a 13.3-m wide platform.
- Year of project completion: 2008