15,650

Equivalent homes

Clean energy for Croatia

Featuring six Nordex wind turbines with a capacity of 4.5 MW, the new wind farm will be commissioned in April 2025.

ACCIONA Energía is building the 27 megawatt (MW) Opor wind farm in Croatia, with the capacity to supply renewable electricity equivalent to the consumption of more than 15,650 Croatian households.

 

Located in the Split-Dalmatia region, it will consist of 6 Nordex wind turbines of 4.5 MW of unit power and 149 meters of rotor, on a steel tower with a hub height of 105 meters. It is scheduled for commissioning in April 2025.

The Opor wind farm, together with the Boraja II wind farm, which the company is building simultaneously, represent ACCIONA Energía's return to investing in the Croatian wind power sector, where it has already been operating the Jelinak wind farm since 2013. The commissioning of the two new wind farms will bring the company's installed capacity in the country to 102 MW.

The Opor and Boraja II projects are linked to a 12-year 'Contract for Difference' (CfD) with the Croatian electricity and gas regulator Hrvatski Operator Trzista Energije (HROTE). This CfD has been allocated by public auction as part of a program launched by the Croatian government and HROTE and approved by the European Commission to accelerate the deployment of renewables and contribute to European decarbonization targets.

 

GENERAL INFORMATION

  • Location: Prgomet, Lećevica, Kaštela. Split-Dalmatia, Croatia.
  • Capacity: 27 MW
  • Wind turbines: 6 Nordex N149/4.5
  • Tower: steel, 105 m hub hight.
  • Start up: April 2025
  • Owner: ACCIONA Energía

KEY POINTS

  • Investment of more than 37 million euros.
  • Estimated average annual production of 75GWh, equivalent to the consumption of about 15,650 homes.
  • Some 33,314 tons of CO2 emissions avoided each year.
  • State-of-the-art wind turbines in onshore wind power.
  • Social and environmental impact management program to improve environmental conditions.

El parque, en cifras

27

megawatts (MW) of total capacity

15,650

equivalent-homes generation

6

wind turbines

33,314

CO2 tonnes avoided a year

37

million euros investment

105

meters hub height

Experience | ACCIONA

How a wind farm is born

Join the tour and discover step by step how a wind farm is built. Check out the video and picture gallery full of fascinating revelations about such a project, in this case Celada Fusion wind farm, helping us move the world without harming the planet.