320m

long

Construction of a mooring line

This project consisted of the construction of a mooring line approximately 320 m long, with a 16-m draft depth, running from the current ramp of the Bufadero Container Base, following an approximately parallel alignment with the current wharf of the eastern container terminal.

GENERAL INFORMATION

  • Location: Canary Islands, Spain.
  • Contract type: Construction.
  • Infrastructure: Mooring line approximately 320 m long, with a 16-m draft depth.
  • Year of project completion: 2008

Other ACCIONA projects

All of our projects