49.05 km

long

Three sections project

Construction, maintenance and concession until 2042 of the Autovía de la Plata A-66 motorway A-66 between Benavente and Zamora measuring 49.05 km long.

The section type had 2 platforms separated by a central reservation of 10.00 metres, with 7.00 m wide carriageways and two lanes measuring 3.50 m each, 1 m inner hard shoulders and 2.50 m outer hard shoulders, with 1.10 m wide shoulders.

The project was divided into three sections:

  • A-6 (Castrogonzalo) - Santovenia del Esla: This section was 14.39 km long and the following elements were worth noting: a viaduct over the Arroyo de Prado Ramiro of 145 m long, 16 level crossings and three junctions.
  • Santovenia del Esla - Fontanillas de Castro: This section was 17.76 km long and the following elements stood out: 5 level crossings, a service area, half-way through the section, with its corresponding slip roads and three junctions.
  • Fontanillas de Castro - Zamora: This section was 16.90 km long and the following elements were worth noting: the viaduct over the Ricobayo dam, 240 m long, 5 level crossings, one service area and two junctions.

GENERAL INFORMATION

  • Location: Castilla y León, Spain
  • Contract type: Construction, maintenance and concession until 2042.
  • Infrastructure: Dual carriageway measuring 49.05 km between Benavente and Zamora.
  • Year of project completion: 2015