All stations are pile-supported elevated structures. The construction included foundations, reinforced concrete works, structural and architectural sidewalks, footbridges, links to the existing subway, new subways, elevated walkway systems, E&M signalling installation and architectural finishing works.
The majority of the viaduct spans were constructed using precast segmental methods and a further five special spans were constructed using free balanced cantilever methods.
GENERAL INFORMATION
- Location: Hong Kong, SAR, China.
- Contract type: Construction.
- Infrastructure: Foundations, reinforced concrete works, structural and architectural sidewalks, footbridges, links to the existing subway, new subways, elevated walkway systems, installation of E&M signalling.
- Year of project completion: 2004