Our foundation: acciona.org Initiatives we support Our strategy Sustainable Development Goals Climate emergency Social development Sustainability indices Sustainable Development Alliances Technology and innovation centres Open and collaborative innovation Digital hub Innovation projects Job offers Graduates and internships Diversity, equity and inclusion Safety, health and well-being Training Selection process Energy Transport Water Social Cities Real Estate Financial Integrated annual reports Annual accounts Results, reports & presentations Average period of payment to suppliers Ratings Share price Dividends Analyst opinions Investor calendar General Shareholders' Meeting Board of Directors and Committees Management team Share capital Annual Corporate Governance Report Director remuneration Governance rules and compliance Framework Agreement CNMV Communications Sustainable finance
Clean energy in Wielkopolskie Great Poland, Poland See on Google Maps
They are two twin wind farms featuring 21 wind turbines in total able to produce enough clean energy from wind to power more than 80,000 homes, thus avoiding the emission of 154,000 metric tons of CO2 a year.

Krobia I and Poniec II wind farms are two twin wind farms featuring 21 wind turbines in total able to produce enough clean energy from wind to power more than 80,000 homes, thus avoiding the emission of 154,000 metric tons of CO2 a year.

 

Each of the ACCIONA Windpower technology wind turbines has 3MW rated capacity and 116m rotor diameter mounted on 120-meter-high concrete tower. Owned, built and operated by ACCIONA Energy, both wind farms make 63 MW of installed capacity.

GENERAL INFORMATION

  • Location: Krobia and Poniec, Greater Poland. Poland.
  • Capacity: 33 MW (Krobia I), 30 MW (Poniec II).
  • Wind turbine: ACCIONA Windpower AW116/3000.
  • Tower: Concrete, hub-height 120m.
  • Start-up: 2013/2015.
  • Owner: ACCIONA Energy International.

KEY FIGURES

  • Average annual production: 160 GWh, equivalent to the consumption of around 80,000 homes
  • 154,000 metric tons of CO2 emissions to the atmosphere from coal-fired power stations avoided
  • Concrete tower with assembled sections manufactured close to the site
  • Foundations for, and installation of, 21 wind turbines
  • 110/30/12 kV substation
  • Project based on detailed technical studies to minimize its impact on the environment
  • Successfully built overcoming harsh winter weather conditions.
  • Installation took place during harsh winter weather conditions