The plant provides drinking water to 138,000 people, a number that can be increased to 300,000 people in the future.
In addition to the DWTP and the supply main, ACCIONA built several raw water pipelines, a pressure piping line, six new regulating tanks and a pumping station.
The entire supply system was upgraded, which entails developing a large drinking water supply network for the towns of Bani, Paya, El Fundo, Matanzas and Arroyo Hondo.
General Information
- Location: Peravia, Dominican Republic
- Capacity: 86,400 m3/d
- Contract type: D&C
- Equivalent population: 138,000 people