Our foundation: acciona.org Initiatives we support Our strategy Sustainable Development Goals Climate emergency Social development Sustainability indices Sustainable Development Alliances Technology and innovation centres Open and collaborative innovation Digital hub Innovation projects Job offers Graduates and internships Diversity, equity and inclusion Safety, health and well-being Training Selection process Energy Transport Water Social Cities Real Estate Financial Integrated annual reports Annual accounts Results, reports & presentations Average period of payment to suppliers Ratings Share price Dividends Analyst opinions Investor calendar General Shareholders' Meeting Board of Directors and Committees Management team Share capital Annual Corporate Governance Report Director remuneration Governance rules and compliance Framework Agreement CNMV Communications Sustainable finance
Cebú, Philippines See on Google Maps
Construction of 8.5 kilometre tollway with 650 metre cable-stayed bridge.

The most anticipated major infrastructure project in Cebú -the 8.5-kilometre Cebú-Cordova Link Expressway, CCLEX, is not only an additional bridge linking the mainland of Cebú to Mactán Island, but has also become at an iconic landmark in the region.

 

On 23 November 2017, the Award announcement for the "Construction and Design" contract was issued from CCLEX to Cebú Link Joint Venture (CLJV), formed by ACCIONA and its two local partners, First Balfour Inc. and D.M. Consunji Inc. The contract was signed on 19 December 2017. The project was completed in 2022.

 

Cebú Córdova Link Expressway Corporation (CCLEC), a subsidiary of Metro Pacific Tollways Corporation (MPTC), managed the construction and oversee the operation of CCLEX through a Joint Venture Agreement with the City of Cebú and the Municipality of Córdova. CCLEX is operated as a tollway.

At the end of the 35-year concession period, the project will be handed off to the two LGU-Grantors.

The project's main structure is the cable-stayed viaduct with a main span of almost 400 metres of light between pylons. In addition, this new infrastructure will also be made up of several viaducts, as well as a 5 kilometre-long stretch of roadway.

The construction of this new bridge provides numerous benefits for managing traffic in the area, alleviating the congestion on existing bridges.

This infrastructure involves a new connection between the industrial area of Cebú and Mactán International Airport, as well as with the new urban developments of Córdova located on the same island, thus constituting a channel of support and a revitalising element for the local economy.

GENERAL INFORMATION

  • Location: Cebú, Philippines.
  • Contract type: Design and construction.
  • Consortium: ACCIONA, First Balfour Inc. and D.M. Consunji Inc.
  • Infrastructure: Construction of 8.5 kilometre tollway with 650 metre cable-stayed bridge.
  • Year of project completion: 2022

KEY ASPECTS

The highway has two lanes in each direction, and a bridge with a design speed of 80-90 kilometres per hour (km/h) and 51 metres high, with navigation authorisation for shipping traffic is expected to serve at least 50,000 vehicles daily.

Currently one of the largest infrastructure projects in the country, CCLEX provides an alternative connection between Mactán Island, where Mactán - Cebú International Airport (MCIA) is located, and Metro Cebú. It will help to decongest traffic on the two existing bridges, the Marcelo Fernán Bridge and the Mandaue - Mactán Bridge. It will strengthen the load capacity of the road network in Metro Cebú.