25,887

equivalent homes

Clean energy for Croatia

Comprising 10 Nordex wind turbines with a capacity of 4.5 MW, the new wind farm will enter service in May 2025.

ACCIONA Energía is building the Boraja II wind farm in Croatia, with 45 megawatts (MW) of power and the capacity to supply renewable electricity equivalent to the consumption of some 25,887 Croatian homes.

 

Located in the Šibenik-Knin region, it will consist of 10 Nordex wind turbines of 4.5 MW of unit power and 149 meters of rotor, on a steel tower with a hub height of 105 meters. It is scheduled for commissioning in May 2025.

The Boraja II wind farm, together with the Opor wind farm, which the company is building simultaneously, represent ACCIONA Energía's return to investing in the Croatian wind power sector, where it has already been operating the Jelinak wind farm since 2013. The commissioning of the two new wind farms will bring the company's installed capacity in the country to 102 MW.

The Opor and Boraja II projects are linked to a 12-year 'Contract for Difference' (CfD) with the Croatian electricity and gas regulator Hrvatski Operator Trzista Energije (HROTE). This CfD has been allocated by public auction as part of a program launched by the Croatian government and HROTE and approved by the European Commission to accelerate the deployment of renewables and contribute to European decarbonization targets.

 

GENERAL INFORMATION

  • Location: Marina, Seget. Šibenik-Knin. Croatia.
  • Capacity: 45 MW
  • Wind turbines: 10 Nordex N149/4.5
  • Tower: steel 125 m hub height.
  • Start up: May 2025
  • Owner: ACCIONA Energía

KEY POINTS

  • Estimated investment of 63 million euros.
  • Estimated average annual production of 128 GWh, equivalent to the consumption of some 25,887 homes.
  • Some 55,107 tons of CO2 emissions avoided each year.
  • State-of-the-art wind turbines in onshore wind power.
  • Social and environmental impact management program to improve environmental conditions.

Key figures

45

megawatts (MW) total capacity

25,887

homes-equivalent production

10

wind turbines

55,105

CO2 emissiones avoided a year

63

million euros investment

105

meters hub height