Our foundation: acciona.org Initiatives we support Our strategy Sustainable Development Goals Climate emergency Social development Sustainability indices Sustainable Development Alliances Technology and innovation centres Open and collaborative innovation Digital hub Innovation projects Job offers Graduates and internships Diversity, equity and inclusion Safety, health and well-being Training Selection process Energy Transport Water Social Cities Real Estate Financial Integrated annual reports Annual accounts Results, reports & presentations Average period of payment to suppliers Ratings Share price Dividends Analyst opinions Investor calendar General Shareholders' Meeting Board of Directors and Committees Management team Share capital Annual Corporate Governance Report Director remuneration Governance rules and compliance Framework Agreement CNMV Communications Sustainable finance
The largest capacity dam in Europe with 4,150 hm3. Portel, Portugal See on Google Maps
The project consisted of the construction of a reservoir in Alqueva (Portugal), the largest in Europe with a capacity of 4,150 Hm3, and which has a reversible hydroelectric power plant of 240 MW. The project included the construction of a power plant at the foot of the dam for two reversible groups of 130 MW each. An intake tower was also built, as well as a mid-bottom outlet for which the existing diversion tunnel is being used.

Construction of a conventional concrete dam of the double-curvature vault type with a maximum height of 96 metres above foundations and a crest length of 485 metres. It includes two surface channel spillways, two half-bottom spillways, all with terminal 'ski jump' structure; a bottom drain of up to 160 m3/s and five towers for the two half-bottom drains, a bottom drain and two water intakes for the hydroelectric power plant.

 

The project included the construction of a hydroelectric power plant at the foot of the reservoir for two reversible groups of 130 MW each. An intake tower was also built, as well as has half-bottom drain bodies, taking advantage of the current diversion tunnel.

 

It is the largest capacity reservoir in Europe with 4,150 hm3 and is mainly intended for the irrigation of 110,000 ha. in the Portuguese region of Alentejo. This strategic water reserve creates an artificial lake of 250 km2, 1,100 km of margins and a line of 82 km, leading to the town of Badajoz.

GENERAL INFORMATION

  • Location: Alqueva – Badajoz, Portugal - Spain.
  • Contract type: Construction.
  • Infrastructure: Conventional concrete vaulted dam (double curvature) with a maximum height of 96 m on its foundations and a total length of 458 m, with a reversible hydroelectric plant of 240 MW. The largest capacity reservoir in Europe with 4,150 hm3.
  • Year of project completion: 2002

BENEFITS FOR THE COMMUNITY

Development of the Portuguese region of Alentejo. In addition to reserving water in an area with a high water shortage, the dam has contributed to the economic and social development of the population.