7.343m

long

Drive and work

The project can be divided into two large parts: Pumping and load breaking, land outfall.

The pumping system consists of a 102-m trench containing two 1,200-mm cast-iron pipes that convey the water to the inlet of the land outfall. At this point, a large load breaking inspection chamber is installed, such that from this point, the water flows by gravity through the outfall, which has a length of 7,344 m and an internal diameter of 3 m. The tunnel excavation was performed with a tunnel boring machine (TBM).

 

The upper part of the chamber will be developed to create a recreational area for urban use.

GENERAL INFORMATION

  • Location: Ferrol, A Coruña, Spain.
  • Contract type: Construction.
  • Infrastructure: 7,343-m long tunnel of 3 metres in diameter and a slope of 1.5 m x 1,000 m.
  • Year of proyect completion: 2008