This 21 km highway has two carriageways, each with two lanes, a 2.5 -m hard shoulder, 16 underpasses, 14 overpasses with 4 pull-out bays with a total length of 58 m. The project was completed in March 2007.
As singular elements, the following stand out:
- 2 double-deck viaducts, the first 128 m long and the second 356 m long.
- 2 overpasses over the N-VI road and one over the Palencia - A Coruña railway line.
- 16 subways and 14 overpasses.
GENERAL INFORMATION
- Location: O Corgo, Lancara and Baralla, Lugo, Spain.
- Contract type: Construction.
- Infrastructure: Two carriageways of two lanes, each with a length of 20.7 km, 2 viaducts, 2 wildlife overpasses, 16 underpasses and 14 overpasses.
- Year of project completion: 2007